Prep Curb And Gutter With Base Cost
Input project size product quality and labor type to get concrete curb and gutter material pricing and installation cost estimates.
Prep curb and gutter with base cost. Item unit cost quantity line cost. No additional charge for excavation site prep gravel base precast concrete curb mid grade rebar and cleanup. Additional cost for gutter net 8 tall x 24 x 3 thick gutter surface. The design of the formwork depends on the type of curb that is to be constructed.
Item unit cost quantity line cost. For a basic project in zip code 47474 with 25 linear feet the cost to install concrete curb and gutter starts at 44 06 54 30 per linear foot. Concrete curb installation 26 71 32 28 per linear foot curb and gutter this is a general cost for curb and gutter installation. 24 77 29 93 per linear foot curb and gutter cost includes manhours for curb and gutter installation.
Additional cost for 6 tall x 18 wide curb with small gutter feature. No demolition of existing curb granite curbing landscaping repairs fuel surchages or sidewalk construction included. Whereas it is proposed to improve the following described street by regrading base reconstruction curb and gutter reconstruction and resurfacing. Free online concrete curb and gutter cost guide breaks down fair prices in your area.
3423 ordering preparation of feasibility report on proposed improvement. Prepare and form pour from truck and finish 6 tall by 12 wide curb. Additional cost for gutter net 6 tall x 24 base for higher volume drainage. The gravel base for both curb and gutter is laid at once and the width of the gravel base will be the combined width of curb and gutter.
The national average cost to install concrete curb and gutter is 6 13 per linear foot with a range between 5 72 to 6 55. Estimate takes into account excavation site prep gravel base precast concrete curb mid grade rebar and cleanup. Additional cost for 8 tall x 8 wide curb with small gutter feature. Get 2020 concrete curb and gutter price options and installation cost ranges.
Prepare and form pour from truck tamp and oil finish 8 tall by 6 wide curb on top a 4 thick aggregate base.