Once the sand floor is troweled smooth exit the pool and immediately install the pool liner before debris blows in or rains come your way.
Sand cement mix for pool bottom. A concrete pool floor is the best pool bottom you can get and the only way a top inground pool builder will build. Mix mortar for laying flagstones flooring bricks and tiles. The ratio here is 4 parts masonry sand 1 part portland cement type i or ii. Use type ii portland cement.
A grout bottom in a swimming pool would be a mortar product of sand and cement and not at all the same as tile grout in terms of the mix design. One ton 1 cubic yard will cover 162 sqft of the area. Adding sand to the bottom is usually preferred as it is less expensive. If your pool contractor is using sand to put in your pool bottom fire him on the spot.
Sand cement 5 1 ratio sand to cement one ton of sand equals one cubic yard. A combination of portland cement sand and vermiculite. Sand cement grout mixes produce a concrete that is not porous and that will not let water pass through it when hydrostatic pressures build up under the bottom of your pool. It will also make the mortar more waterproof.
Different pool bottom options. For starters when properly installed this mixture will outlast packed sand or sand cement bottoms due to its high adhesion characteristics which prevents wash outs and liner abuse due to abrasions. There are varieties of materials to use for pool base sand cement and vermiculite cement. Pool krete premix is a quality blend of expanded vermiculite portland cement and admixtures designed to be mixed with water and troweled to form a long lasting hard bottom for in ground vinyl.
This pre mix is a porous but rigid liner base which offers numerous benefits to both the pool installer and the pool owner. Above ground swimming pools are generally less expensive and more for the budget minded consumer. Mix it with water in a rotary mixer and deliver the mixed material in 5 gallon buckets handed into the pool. Adding hydrated lime to the mixture will reduce shrinkage cracks.
Pre mix pool krete pool crete the top choice among builders though is pre mix also commonly referred to as either pool krete or pool crete. Use a ratio of 3 parts sand to 1 5 parts cement. No water needed for this just keep it at a four to one ratio and mist it when done to help it set. Clean all loose debris rocks sticks etc from the pool.
If you add lime the mixture will be 15 gallons of sand 6 38 gallons of cement and 1 12 gallons of lime. A sand and cement pool floor tends to be a little harder and more abrasive on the liner than using a vermiculite mix but is still a great pool floor option. Sand or vermiculite for my above ground pool.